A future-ready 60,000 sq. ft. facility designed for 600 MT per month, consistent quality and long-term growth.
CERTIFIED FOUNDRY
Civil & utilities
Plant infrastructure and sustainable utility systems.
Line installation
High-pressure moulding and 500 kg induction furnaces.
Trials & validation
Process proving, quality approval and team readiness.
April 2026
Planned commissioning for customer programs.
Analyze metal flow, solidification and potential defect tendencies.
Fully automated 24 × 28 inch high-pressure line.
7,000 sq. ft. fettling and surface finishing area.
5,000 sq. ft. with VMC, CNC and conventional machines.
In-house sand, shell core, moulding and machining capabilities reduce handoffs and help maintain process consistency.
Spectrometer plus complete metal and sand testing setup.
Structured systems designed around employee protection.
Rainwater, ETP and solar systems integrated from inception.